% year, date, start time (HHMMSS, UT), end time (HHMMSS, UT), % Geographic latitude (120 km alt), Geographic longitude (120 km alt), % Alt of max(Sig_P) [km], Height-integrated Sig_P [S], % Altitude of max(Sig_H) [km], Height-integrated Sig_H [S], % Altitude of maximum(Ne) [km], Maximum(Ne) [log(m^(-3))] % Elevation, Azimuth, Kp, and Solar zenith angle (SZA) % Magic constant = 1 1992 1013 110000 110500 69.58 19.23 120 5.284 114 5.852 149 11.003 90.1 353.3 1 78.2 1992 1013 110500 111000 69.58 19.23 120 5.022 114 5.260 149 10.980 90.1 353.3 1 78.2 1992 1013 111000 111500 69.58 19.23 124 4.789 111 4.772 147 10.968 90.1 353.3 1 78.3 1992 1013 111500 112000 69.58 19.23 120 4.818 114 4.790 149 11.010 90.1 353.3 1 78.4 1992 1013 112000 112500 69.58 19.23 120 5.109 111 5.181 147 10.997 90.1 353.3 1 78.5 1992 1013 112500 113000 69.58 19.23 120 5.021 111 4.952 142 11.007 90.1 353.3 1 78.6 1992 1013 113000 113500 69.58 19.23 120 5.715 114 5.459 146 11.052 90.1 353.3 1 78.7 1992 1013 113500 114000 69.58 19.23 117 5.708 114 5.613 133 11.065 90.1 353.3 1 78.8 1992 1013 114000 114500 69.58 19.23 117 6.468 114 6.707 117 11.168 90.1 353.3 1 79.0 1992 1013 114500 115000 69.58 19.23 120 4.903 111 4.318 146 10.950 90.1 353.3 1 79.1 1992 1013 115000 115500 69.58 19.23 120 5.518 114 5.348 124 11.042 90.1 353.3 1 79.2 1992 1013 115500 120000 69.58 19.23 120 5.964 114 6.086 120 11.094 90.1 353.3 1 79.4 1992 1013 120000 120500 69.58 19.23 120 5.493 114 5.524 120 11.071 90.1 353.3 3 79.6 1992 1013 120500 121000 69.58 19.23 120 5.625 111 5.655 124 11.097 90.1 353.3 3 79.7 1992 1013 121000 121500 69.58 19.23 120 5.144 114 5.139 147 11.011 90.1 353.3 3 79.9 1992 1013 121500 122000 69.58 19.23 124 4.992 114 4.422 136 10.962 90.1 353.3 3 80.1 1992 1013 122000 122500 69.58 19.23 120 5.006 111 4.147 136 10.931 90.1 353.3 3 80.3 1992 1013 122500 123000 69.58 19.23 120 4.428 111 4.042 147 10.909 90.1 353.3 3 80.5 1992 1013 123000 123500 69.58 19.23 120 4.277 111 3.922 147 10.896 90.1 353.3 3 80.8 1992 1013 123500 124000 69.58 19.23 124 4.180 114 4.105 147 10.905 90.1 353.3 3 81.0 1992 1013 124000 124500 69.58 19.23 124 4.249 111 3.924 147 10.905 90.1 353.3 3 81.2 1992 1013 124500 125000 69.58 19.23 124 3.859 111 3.427 147 10.873 90.1 353.3 3 81.5 1992 1013 125000 125500 69.58 19.23 120 3.909 111 3.556 149 10.860 90.1 353.3 3 81.7 1992 1013 125500 130000 69.58 19.23 124 3.764 111 3.407 136 10.844 90.1 353.3 3 82.0 1992 1013 130000 130500 69.58 19.23 120 3.524 111 3.343 147 10.868 90.1 353.3 3 82.2 1992 1013 130500 131000 69.58 19.23 120 3.595 108 3.552 136 10.910 90.1 353.3 3 82.5 1992 1013 131000 131500 69.58 19.23 124 2.016 114 2.148 130 10.677 90.1 353.3 3 82.8 1992 1013 131500 132000 69.58 19.23 120 3.362 114 3.363 136 10.900 90.1 353.3 3 83.1 1992 1013 132000 132500 69.58 19.23 124 3.004 111 3.205 147 10.819 90.1 353.3 3 83.4 1992 1013 132500 133000 69.58 19.23 124 3.529 111 4.005 130 10.959 90.1 353.3 3 83.7 1992 1013 133000 133500 69.58 19.23 120 2.840 108 3.065 147 10.804 90.1 353.3 3 84.0 1992 1013 133500 134000 69.58 19.23 124 2.848 111 3.101 147 10.811 90.1 353.3 3 84.3 1992 1013 134000 134500 69.58 19.23 124 2.905 111 3.052 133 10.808 90.1 353.3 3 84.6 1992 1013 134500 134945 69.58 19.23 120 3.277 114 3.527 124 10.849 90.1 353.3 3 84.9