% year, date, start time (HHMMSS, UT), end time (HHMMSS, UT), % Geographic latitude (120 km alt), Geographic longitude (120 km alt), % Alt of max(Sig_P) [km], Height-integrated Sig_P [S], % Altitude of max(Sig_H) [km], Height-integrated Sig_H [S], % Altitude of maximum(Ne) [km], Maximum(Ne) [log(m^(-3))] % Elevation, Azimuth, Kp, and Solar zenith angle (SZA) % Magic constant = 1 1997 1104 235955 0 69.46 17.41 129 6.307 113 4.752 129 11.339 58.1 259.6 1 124.3 1997 1105 0 500 69.46 17.41 121 5.696 113 3.458 121 10.894 58.1 259.6 0 124.3 1997 1105 500 1000 69.46 17.41 121 5.289 113 2.929 135 10.863 58.1 259.6 0 124.1 1997 1105 1000 1500 69.46 17.41 121 5.128 111 4.522 129 10.844 58.1 259.6 0 123.8 1997 1105 1500 2000 69.46 17.41 119 4.218 113 2.194 124 10.728 58.1 259.6 0 123.6 1997 1105 2000 2500 69.46 17.41 124 3.649 113 1.481 124 10.749 58.1 259.6 0 123.4 1997 1105 2500 3000 69.46 17.41 124 3.561 113 2.004 124 10.707 58.1 259.6 0 123.1 1997 1105 3000 3500 69.46 17.41 119 3.494 116 1.847 124 10.693 58.1 259.6 0 122.9 1997 1105 3500 4000 69.46 17.41 119 3.310 113 1.623 129 10.667 58.1 259.6 0 122.6 1997 1105 4000 4500 69.46 17.41 119 2.910 113 1.505 113 10.571 58.1 259.6 0 122.4 1997 1105 4500 5000 69.46 17.41 119 2.490 92 2.149 127 10.513 58.1 259.6 0 122.1 1997 1105 5000 5025 69.46 17.41 124 2.697 116 0.344 124 10.943 58.1 259.6 0 121.8 1997 1105 185000 185500 69.46 17.41 119 3.371 111 2.995 119 10.676 58.1 259.6 1 117.0 1997 1105 185500 190000 69.46 17.41 121 5.955 113 3.820 121 10.916 58.1 259.6 1 117.4 1997 1105 190000 190500 69.46 17.41 119 6.392 116 4.770 127 10.937 58.1 259.6 1 117.8 1997 1105 190500 191000 69.46 17.41 121 5.210 111 4.104 121 10.856 58.1 259.6 1 118.1 1997 1105 191000 191500 69.46 17.41 121 5.098 105 3.554 135 10.833 58.1 259.6 1 118.5 1997 1105 191500 192000 69.46 17.41 124 4.639 113 2.738 132 10.814 58.1 259.6 1 118.9 1997 1105 192000 192500 69.46 17.41 119 4.491 108 3.428 124 10.802 58.1 259.6 1 119.2 1997 1105 192500 193000 69.46 17.41 119 3.816 113 2.331 137 10.725 58.1 259.6 1 119.6 1997 1105 193000 193500 69.46 17.41 121 9.659 113 7.392 143 11.153 58.1 259.6 1 119.9 1997 1105 193500 194000 69.46 17.41 119 15.526 113 12.852 119 11.336 58.1 259.6 1 120.2 1997 1105 194000 194500 69.46 17.41 121 18.352 113 15.601 121 11.406 58.1 259.6 1 120.6 1997 1105 194500 195000 69.46 17.41 119 23.663 111 23.252 113 11.564 58.1 259.6 1 120.9 1997 1105 195010 195500 69.46 17.41 119 19.570 111 20.065 116 11.581 58.1 259.6 1 121.2 1997 1105 195500 200000 69.46 17.41 121 8.836 113 5.458 148 11.060 58.1 259.6 1 121.5 1997 1105 200000 200500 69.46 17.41 121 10.077 113 7.120 148 11.210 58.1 259.6 1 121.8 1997 1105 200500 201000 69.46 17.41 119 15.002 113 11.201 146 11.288 58.1 259.6 1 122.1 1997 1105 201000 201455 69.46 17.41 119 7.875 113 4.987 129 10.980 58.1 259.6 1 122.4 1997 1105 201000 201500 69.46 17.41 119 0.450 113 2.724 129 10.994 58.1 259.6 1 122.4 1997 1105 201500 202000 69.46 17.41 121 23.141 116 18.061 121 11.501 58.1 259.6 1 122.7 1997 1105 202000 202500 69.46 17.41 121 11.129 113 8.413 127 11.187 58.1 259.6 1 122.9 1997 1105 202500 203000 69.46 17.41 121 12.040 113 8.194 129 11.218 58.1 259.6 1 123.2 1997 1105 203000 203500 69.46 17.41 121 3.517 111 1.771 148 10.795 58.1 259.6 1 123.4 1997 1105 203500 204000 69.46 17.41 116 1.364 108 1.134 108 10.638 58.1 259.6 1 123.7 1997 1105 204000 204500 69.46 17.41 121 2.653 108 1.387 148 10.710 58.1 259.6 1 123.9 1997 1105 204500 205000 69.46 17.41 124 3.883 108 2.153 143 10.777 58.1 259.6 1 124.1 1997 1105 205000 205500 69.46 17.41 121 8.088 113 5.842 132 10.995 58.1 259.6 1 124.4 1997 1105 205500 210000 69.46 17.41 119 12.184 111 9.298 124 11.210 58.1 259.6 1 124.6