% year, date, start time (HHMMSS, UT), end time (HHMMSS, UT), % Geographic latitude (120 km alt), Geographic longitude (120 km alt), % Alt of max(Sig_P) [km], Height-integrated Sig_P [S], % Altitude of max(Sig_H) [km], Height-integrated Sig_H [S], % Altitude of maximum(Ne) [km], Maximum(Ne) [log(m^(-3))] % Elevation, Azimuth, Kp, and Solar zenith angle (SZA) % Magic constant = 1 1998 1106 175600 180000 69.35 19.19 120 3.731 111 7.531 127 11.121 77.2 183.2 4 112.9 1998 1106 180000 180500 69.35 19.19 120 2.390 111 4.607 133 10.915 77.2 183.2 3 113.3 1998 1106 180500 181000 69.35 19.19 120 2.588 111 4.219 130 11.000 77.2 183.2 3 113.7 1998 1106 181000 181500 69.35 19.19 120 3.849 114 7.341 114 11.124 77.2 183.2 3 114.1 1998 1106 181500 182000 69.35 19.19 120 3.180 111 7.204 114 11.076 77.2 183.2 3 114.5 1998 1106 182000 182500 69.35 19.19 120 2.715 111 6.175 120 11.020 77.2 183.2 3 114.9 1998 1106 182500 183000 69.35 19.19 120 2.687 114 5.351 127 11.010 77.2 183.2 3 115.3 1998 1106 183000 183500 69.35 19.19 120 2.393 111 5.252 133 10.957 77.2 183.2 3 115.7 1998 1106 183500 184000 69.35 19.19 120 2.514 111 4.672 127 10.966 77.2 183.2 3 116.1 1998 1106 184000 184500 69.35 19.19 120 2.379 114 4.498 124 10.968 77.2 183.2 3 116.5 1998 1106 184500 185000 69.35 19.19 120 2.111 114 3.687 127 10.917 77.2 183.2 3 116.9 1998 1106 185000 185500 69.35 19.19 120 1.842 114 2.890 127 10.827 77.2 183.2 3 117.3 1998 1106 185500 190000 69.35 19.19 120 1.689 114 2.359 133 10.795 77.2 183.2 3 117.7 1998 1106 190000 190500 69.35 19.19 124 1.992 114 2.778 148 10.916 77.2 183.2 3 118.1 1998 1106 190500 191000 69.35 19.19 120 4.437 114 5.780 130 11.279 77.2 183.2 3 118.4 1998 1106 191000 191500 69.35 19.19 120 3.662 117 5.355 130 11.201 77.2 183.2 3 118.8 1998 1106 191500 192000 69.35 19.19 120 1.450 114 1.720 145 10.799 77.2 183.2 3 119.1 1998 1106 192000 192500 69.35 19.19 124 2.177 114 2.838 133 10.923 77.2 183.2 3 119.5 1998 1106 192645 192955 69.35 19.19 127 1.110 114 0.945 148 10.573 77.2 183.2 3 119.9 1998 1106 192959 193500 69.35 19.19 120 1.313 102 2.211 136 10.740 77.2 183.2 3 120.1 1998 1106 193500 194000 69.35 19.19 120 2.723 102 4.471 145 11.014 77.2 183.2 3 120.5 1998 1106 194000 194500 69.35 19.19 120 2.537 114 3.648 120 10.924 77.2 183.2 3 120.9 1998 1106 194500 195000 69.35 19.19 120 3.063 114 4.925 133 11.079 77.2 183.2 3 121.2 1998 1106 195000 195500 69.35 19.19 117 2.108 111 3.915 117 10.883 77.2 183.2 3 121.5 1998 1106 195500 200000 69.35 19.19 117 0.789 111 1.463 124 10.444 77.2 183.2 3 121.8 1998 1106 200000 200500 69.35 19.19 120 2.638 111 3.756 130 10.968 77.2 183.2 3 122.1 1998 1106 200500 201000 69.35 19.19 120 1.304 111 2.008 142 10.663 77.2 183.2 3 122.4 1998 1106 201000 201500 69.35 19.19 124 1.040 108 1.848 139 10.705 77.2 183.2 3 122.7 1998 1106 201500 202000 69.35 19.19 120 5.740 114 7.755 127 11.355 77.2 183.2 3 123.0 1998 1106 202000 202500 69.35 19.19 120 4.063 111 5.613 130 11.175 77.2 183.2 3 123.2 1998 1106 202500 203000 69.35 19.19 120 1.808 114 2.750 139 10.837 77.2 183.2 3 123.5 1998 1106 203000 203500 69.35 19.19 120 2.224 114 3.181 145 10.925 77.2 183.2 3 123.7 1998 1106 203500 204000 69.35 19.19 120 2.131 114 3.316 148 10.879 77.2 183.2 3 124.0 1998 1106 204000 204500 69.35 19.19 120 1.787 114 3.140 148 10.807 77.2 183.2 3 124.2 1998 1106 204500 205000 69.35 19.19 120 1.365 111 2.661 142 10.735 77.2 183.2 3 124.4 1998 1106 205000 205500 69.35 19.19 124 1.609 114 2.420 145 10.852 77.2 183.2 3 124.7 1998 1106 205500 210000 69.35 19.19 120 2.269 108 4.408 139 10.931 77.2 183.2 3 124.9 1998 1106 210000 210500 69.35 19.19 120 6.399 111 14.218 111 11.359 77.2 183.2 4 125.1 1998 1106 210500 211000 69.35 19.19 120 6.652 111 14.579 120 11.401 77.2 183.2 4 125.2 1998 1106 211000 211500 69.35 19.19 114 0.806 114 1.640 145 10.513 77.2 183.2 4 125.4 1998 1106 211500 212000 69.35 19.19 117 0.834 108 2.342 108 10.648 77.2 183.2 4 125.6 1998 1106 212000 212500 69.35 19.19 114 0.733 108 2.224 136 10.605 77.2 183.2 4 125.7 1998 1106 212500 213000 69.35 19.19 117 1.102 108 2.245 142 10.661 77.2 183.2 4 125.9 1998 1106 213000 213500 69.35 19.19 124 1.367 114 2.293 148 10.733 77.2 183.2 4 126.0 1998 1106 213500 214000 69.35 19.19 124 0.984 114 1.700 136 10.551 77.2 183.2 4 126.1 1998 1106 214000 214500 69.35 19.19 117 1.570 111 3.398 148 10.792 77.2 183.2 4 126.2 1998 1106 214500 215000 69.35 19.19 120 1.530 108 3.498 145 10.820 77.2 183.2 4 126.3 1998 1106 215000 215500 69.35 19.19 114 0.917 105 2.103 148 10.659 77.2 183.2 4 126.4 1998 1106 215500 220000 69.35 19.19 117 0.899 108 2.161 145 10.592 77.2 183.2 4 126.5 1998 1106 220000 220500 69.35 19.19 120 0.779 108 2.162 148 10.564 77.2 183.2 4 126.6 1998 1106 220500 221000 69.35 19.19 120 1.211 111 2.253 145 10.772 77.2 183.2 4 126.6 1998 1106 221000 221500 69.35 19.19 114 1.791 105 3.449 105 10.773 77.2 183.2 4 126.7 1998 1106 221500 222000 69.35 19.19 120 4.388 111 10.889 111 11.218 77.2 183.2 4 126.7 1998 1106 222000 222500 69.35 19.19 117 4.223 111 8.908 117 11.193 77.2 183.2 4 126.7 1998 1106 222500 223000 69.35 19.19 117 5.139 108 12.894 114 11.301 77.2 183.2 4 126.8 1998 1106 223000 223500 69.35 19.19 117 5.405 111 14.749 111 11.363 77.2 183.2 4 126.8 1998 1106 223500 224000 69.35 19.19 117 3.990 111 9.418 114 11.219 77.2 183.2 4 126.7 1998 1106 224000 224500 69.35 19.19 117 6.228 114 7.952 117 11.141 77.2 183.2 4 126.7 1998 1106 224500 225000 69.35 19.19 120 5.844 108 16.489 108 11.422 77.2 183.2 4 126.7 1998 1106 225000 225500 69.35 19.19 120 5.693 114 10.791 120 11.358 77.2 183.2 4 126.6 1998 1106 225500 230000 69.35 19.19 120 3.351 114 4.078 114 10.815 77.2 183.2 4 126.6 1998 1106 230000 230010 69.35 19.19 120 5.701 108 6.046 145 11.296 77.2 183.2 4 126.5