% year, date, start time (HHMMSS, UT), end time (HHMMSS, UT), % Geographic latitude (120 km alt), Geographic longitude (120 km alt), % Alt of max(Sig_P) [km], Height-integrated Sig_P [S], % Altitude of max(Sig_H) [km], Height-integrated Sig_H [S], % Altitude of maximum(Ne) [km], Maximum(Ne) [log(m^(-3))] % Elevation, Azimuth, Kp, and Solar zenith angle (SZA) % Magic constant = 1 1999 1018 120000 120500 69.35 19.19 120 3.139 111 2.825 148 10.787 77.2 183.2 2 81.1 1999 1018 120500 121000 69.35 19.19 120 3.072 111 2.792 145 10.755 77.2 183.2 2 81.2 1999 1018 121000 121500 69.35 19.19 120 3.279 114 2.905 142 10.713 77.2 183.2 2 81.4 1999 1018 121500 122000 69.35 19.19 120 3.149 114 2.908 148 10.740 77.2 183.2 2 81.6 1999 1018 122000 122500 69.35 19.19 120 2.900 114 2.539 148 10.696 77.2 183.2 2 81.8 1999 1018 122500 123000 69.35 19.19 124 2.847 114 2.744 148 10.724 77.2 183.2 2 82.0 1999 1018 123000 123500 69.35 19.19 120 3.000 114 2.839 133 10.725 77.2 183.2 2 82.2 1999 1018 123500 124000 69.35 19.19 120 2.886 111 2.695 124 10.662 77.2 183.2 2 82.5 1999 1018 124000 124500 69.35 19.19 120 3.000 111 2.775 148 10.705 77.2 183.2 2 82.7 1999 1018 124500 125000 69.35 19.19 124 2.918 114 2.803 142 10.719 77.2 183.2 2 82.9 1999 1018 125000 125500 69.35 19.19 117 2.845 111 2.815 148 10.666 77.2 183.2 2 83.2 1999 1018 125500 130000 69.35 19.19 124 2.576 114 2.451 142 10.693 77.2 183.2 2 83.4 1999 1018 130000 130500 69.35 19.19 120 2.554 111 2.620 130 10.685 77.2 183.2 2 83.7 1999 1018 130500 131000 69.35 19.19 117 2.271 114 2.246 148 10.651 77.2 183.2 2 84.0 1999 1018 131000 131500 69.35 19.19 124 2.387 96 2.361 148 10.627 77.2 183.2 2 84.3 1999 1018 131500 132000 69.35 19.19 120 2.247 114 2.256 148 10.655 77.2 183.2 2 84.5 1999 1018 132000 132500 69.35 19.19 120 2.161 111 2.177 145 10.714 77.2 183.2 2 84.8 1999 1018 132500 133000 69.35 19.19 120 2.160 111 2.198 148 10.656 77.2 183.2 2 85.1 1999 1018 133000 133500 69.35 19.19 120 2.238 111 2.238 145 10.681 77.2 183.2 2 85.4 1999 1018 133500 134000 69.35 19.19 127 2.566 111 2.164 139 10.637 77.2 183.2 2 85.7 1999 1018 134000 134500 69.35 19.19 117 2.276 111 1.906 136 10.625 77.2 183.2 2 86.1 1999 1018 134500 135000 69.35 19.19 120 2.129 93 1.877 148 10.600 77.2 183.2 2 86.4 1999 1018 135000 135500 69.35 19.19 120 2.045 111 1.845 133 10.571 77.2 183.2 2 86.7 1999 1018 135500 140000 69.35 19.19 120 2.257 111 1.815 142 10.636 77.2 183.2 2 87.1 1999 1018 140000 140500 69.35 19.19 124 1.933 111 1.676 148 10.538 77.2 183.2 2 87.4 1999 1018 140500 141000 69.35 19.19 124 1.622 111 1.603 145 10.527 77.2 183.2 2 87.7 1999 1018 141000 141500 69.35 19.19 124 1.650 93 1.557 139 10.542 77.2 183.2 2 88.1 1999 1018 141500 142000 69.35 19.19 124 2.343 93 1.490 130 10.505 77.2 183.2 2 88.5 1999 1018 142000 142500 69.35 19.19 124 1.388 114 1.588 127 10.467 77.2 183.2 2 88.8 1999 1018 142500 143000 69.35 19.19 124 1.356 93 1.700 93 10.891 77.2 183.2 2 89.2 1999 1018 143000 143500 69.35 19.19 120 1.258 108 0.982 139 10.582 77.2 183.2 2 89.6 1999 1018 143500 144000 69.35 19.19 124 1.054 108 1.309 127 10.381 77.2 183.2 2 89.9 1999 1018 144000 144500 69.35 19.19 117 1.044 108 0.973 148 10.473 77.2 183.2 2 90.3 1999 1018 144500 145000 69.35 19.19 124 0.821 111 0.869 148 10.408 77.2 183.2 2 90.7 1999 1018 145000 145500 69.35 19.19 117 0.908 111 0.864 139 10.416 77.2 183.2 2 91.1 1999 1018 145500 150000 69.35 19.19 127 0.774 108 0.637 127 10.329 77.2 183.2 2 91.5 1999 1018 150000 150500 69.35 19.19 117 0.778 111 0.881 111 10.349 77.2 183.2 2 91.9 1999 1018 150500 151000 69.35 19.19 124 0.884 93 0.941 93 10.469 77.2 183.2 2 92.3 1999 1018 151000 151500 69.35 19.19 120 0.950 93 1.104 93 10.456 77.2 183.2 2 92.7 1999 1018 151500 152000 69.35 19.19 120 0.876 93 0.921 93 10.450 77.2 183.2 2 93.1 1999 1018 152000 152500 69.35 19.19 124 0.738 111 0.536 130 10.286 77.2 183.2 2 93.5 1999 1018 152500 153000 69.35 19.19 130 0.646 93 0.715 93 10.437 77.2 183.2 2 93.9 1999 1018 153000 153500 69.35 19.19 127 0.728 93 0.683 93 10.500 77.2 183.2 2 94.3 1999 1018 153500 154000 69.35 19.19 127 0.561 108 0.409 133 10.322 77.2 183.2 2 94.8 1999 1018 154000 154500 69.35 19.19 120 0.536 93 0.389 136 10.291 77.2 183.2 2 95.2 1999 1018 154500 155000 69.35 19.19 130 0.306 93 0.583 93 10.515 77.2 183.2 2 95.6 1999 1018 155000 155500 69.35 19.19 133 0.350 114 0.319 139 10.341 77.2 183.2 2 96.0 1999 1018 155500 160000 69.35 19.19 127 0.468 108 0.388 136 10.416 77.2 183.2 2 96.5 1999 1018 160100 160305 69.35 19.19 145 0.348 145 -0.020 145 10.288 77.2 183.2 2 97.0