% year, date, start time (HHMMSS, UT), end time (HHMMSS, UT), % Geographic latitude (120 km alt), Geographic longitude (120 km alt), % Alt of max(Sig_P) [km], Height-integrated Sig_P [S], % Altitude of max(Sig_H) [km], Height-integrated Sig_H [S], % Altitude of maximum(Ne) [km], Maximum(Ne) [log(m^(-3))] % Elevation, Azimuth, Kp, and Solar zenith angle (SZA) % Magic constant = 1 2002 1116 42835 43000 69.35 19.18 120 2.755 114 3.021 134 10.776 77.1 184.0 1 107.7 2002 1116 43000 43500 69.35 19.18 120 3.589 110 5.027 110 11.113 77.1 184.0 1 107.5 2002 1116 43500 44000 69.35 19.18 120 2.401 114 2.507 134 10.737 77.1 184.0 1 107.1 2002 1116 44000 44500 69.35 19.18 120 2.175 97 2.397 127 10.667 77.1 184.0 1 106.6 2002 1116 44500 45000 69.35 19.18 120 2.333 114 2.522 127 10.726 77.1 184.0 1 106.2 2002 1116 45000 45500 69.35 19.18 120 2.183 114 2.369 142 10.671 77.1 184.0 1 105.8 2002 1116 45500 50000 69.35 19.18 120 2.141 92 2.625 127 10.705 77.1 184.0 1 105.4 2002 1116 50000 50500 69.35 19.18 120 1.950 114 1.905 127 10.642 77.1 184.0 1 104.9 2002 1116 50500 51000 69.35 19.18 120 1.763 97 2.228 97 10.598 77.1 184.0 1 104.5 2002 1116 51000 51500 69.35 19.18 120 2.452 110 2.763 127 10.743 77.1 184.0 1 104.1 2002 1116 51500 52000 69.35 19.18 120 2.188 114 2.276 120 10.667 77.1 184.0 1 103.7 2002 1116 52000 52500 69.35 19.18 120 2.424 114 2.856 120 10.749 77.1 184.0 1 103.3 2002 1116 52500 53000 69.35 19.18 120 2.220 114 2.619 142 10.714 77.1 184.0 1 102.8 2002 1116 53000 53500 69.35 19.18 120 1.988 114 2.419 142 10.661 77.1 184.0 1 102.4 2002 1116 53500 54000 69.35 19.18 120 2.411 110 2.963 142 10.726 77.1 184.0 1 102.0 2002 1116 54000 54500 69.35 19.18 120 2.779 110 3.520 142 10.811 77.1 184.0 1 101.6 2002 1116 54500 55000 69.35 19.18 120 2.549 114 3.145 134 10.783 77.1 184.0 1 101.2 2002 1116 55000 55500 69.35 19.18 120 2.172 110 2.641 134 10.701 77.1 184.0 1 100.8 2002 1116 55500 60000 69.35 19.18 120 2.363 114 2.848 114 10.728 77.1 184.0 1 100.4 2002 1116 60000 60500 69.35 19.18 120 2.381 110 3.040 114 10.724 77.1 184.0 1 100.1 2002 1116 60500 61000 69.35 19.18 120 2.141 110 2.658 114 10.684 77.1 184.0 1 99.7 2002 1116 61000 61500 69.35 19.18 120 1.843 114 1.995 134 10.622 77.1 184.0 1 99.3 2002 1116 61500 62000 69.35 19.18 120 2.684 110 3.169 114 10.801 77.1 184.0 1 98.9 2002 1116 62000 62500 69.35 19.18 120 1.891 110 2.216 142 10.627 77.1 184.0 1 98.6 2002 1116 62500 63000 69.35 19.18 120 1.611 110 2.036 134 10.576 77.1 184.0 1 98.2 2002 1116 63000 63500 69.35 19.18 120 1.216 97 1.627 134 10.423 77.1 184.0 1 97.8 2002 1116 63500 64000 69.35 19.18 120 1.827 114 2.297 127 10.596 77.1 184.0 1 97.5 2002 1116 64000 64500 69.35 19.18 120 2.230 114 2.628 127 10.676 77.1 184.0 1 97.1 2002 1116 64500 65000 69.35 19.18 120 1.486 110 1.624 142 10.449 77.1 184.0 1 96.8 2002 1116 65000 65500 69.35 19.18 120 0.946 114 1.103 134 10.318 77.1 184.0 1 96.4 2002 1116 65500 70000 69.35 19.18 120 1.182 97 1.046 134 10.401 77.1 184.0 1 96.1 2002 1116 70000 70500 69.35 19.18 120 1.234 97 1.255 134 10.355 77.1 184.0 1 95.8 2002 1116 70500 71000 69.35 19.18 120 2.156 114 2.127 127 10.641 77.1 184.0 1 95.4 2002 1116 71000 71500 69.35 19.18 120 2.144 114 2.218 127 10.618 77.1 184.0 1 95.1 2002 1116 71500 72000 69.35 19.18 120 1.756 114 1.520 142 10.487 77.1 184.0 1 94.8 2002 1116 72000 72500 69.35 19.18 120 0.369 92 0.316 142 9.857 77.1 184.0 1 94.5 2002 1116 72500 73000 69.35 19.18 120 1.549 97 1.265 142 10.370 77.1 184.0 1 94.2 2002 1116 73000 73500 69.35 19.18 120 1.560 106 1.181 142 10.415 77.1 184.0 1 93.9 2002 1116 73500 74000 69.35 19.18 120 1.648 106 1.427 134 10.437 77.1 184.0 1 93.6 2002 1116 74000 74500 69.35 19.18 120 1.768 106 1.888 127 10.427 77.1 184.0 1 93.4 2002 1116 74500 75000 69.35 19.18 120 1.932 106 1.985 106 10.490 77.1 184.0 1 93.1 2002 1116 75000 75500 69.35 19.18 120 1.995 106 2.083 106 10.524 77.1 184.0 1 92.8 2002 1116 75500 80000 69.35 19.18 120 2.146 103 2.059 134 10.502 77.1 184.0 1 92.6