% year, date, start time (HHMMSS, UT), end time (HHMMSS, UT), % Geographic latitude (120 km alt), Geographic longitude (120 km alt), % Alt of max(Sig_P) [km], Height-integrated Sig_P [S], % Altitude of max(Sig_H) [km], Height-integrated Sig_H [S], % Altitude of maximum(Ne) [km], Maximum(Ne) [log(m^(-3))] % Elevation, Azimuth, Kp, and Solar zenith angle (SZA) % Magic constant = 1 2011 1115 100025 100500 69.36 19.16 120 3.164 115 1.760 142 10.604 77.5 186.2 2 88.4 2011 1115 100500 101000 69.36 19.16 120 3.828 115 1.991 142 10.591 77.5 186.2 2 88.3 2011 1115 101000 101500 69.36 19.16 120 4.048 115 2.357 142 10.648 77.5 186.2 2 88.3 2011 1115 101500 102000 69.36 19.16 120 3.562 95 2.622 134 10.610 77.5 186.2 2 88.3 2011 1115 102000 102500 69.36 19.16 120 3.859 95 2.800 142 10.604 77.5 186.2 2 88.3 2011 1115 102500 103000 69.36 19.16 120 4.051 91 2.740 142 10.600 77.5 186.2 2 88.3 2011 1115 103000 103500 69.36 19.16 120 4.020 95 2.848 127 10.573 77.5 186.2 2 88.3 2011 1115 103500 104000 69.36 19.16 120 4.091 92 2.960 142 10.636 77.5 186.2 2 88.3 2011 1115 104000 104500 69.36 19.16 120 4.169 92 2.900 134 10.640 77.5 186.2 2 88.3 2011 1115 104500 105000 69.36 19.16 120 4.130 92 2.635 127 10.618 77.5 186.2 2 88.3 2011 1115 105000 105500 69.36 19.16 120 4.295 95 2.696 127 10.637 77.5 186.2 2 88.3 2011 1115 105500 110000 69.36 19.16 120 4.817 92 2.902 134 10.633 77.5 186.2 2 88.4 2011 1115 110000 110500 69.36 19.16 120 4.446 95 2.387 134 10.598 77.5 186.2 2 88.4 2011 1115 110500 111000 69.36 19.16 120 4.512 98 2.369 142 10.609 77.5 186.2 2 88.5 2011 1115 111000 111500 69.36 19.16 120 4.017 98 2.228 142 10.558 77.5 186.2 2 88.6 2011 1115 111500 112000 69.36 19.16 120 4.292 115 2.443 127 10.544 77.5 186.2 2 88.7 2011 1115 112000 112500 69.36 19.16 120 4.229 98 2.403 142 10.565 77.5 186.2 2 88.7 2011 1115 112500 113000 69.36 19.16 120 4.251 95 2.470 142 10.570 77.5 186.2 2 88.8 2011 1115 113000 113500 69.36 19.16 120 4.258 98 2.366 142 10.606 77.5 186.2 2 89.0 2011 1115 113500 114000 69.36 19.16 120 3.975 115 2.227 142 10.548 77.5 186.2 2 89.1 2011 1115 114000 114500 69.36 19.16 120 4.146 98 2.044 142 10.554 77.5 186.2 2 89.2 2011 1115 114500 115000 69.36 19.16 120 4.358 98 2.120 142 10.568 77.5 186.2 2 89.3 2011 1115 115000 115500 69.36 19.16 120 3.989 95 2.246 142 10.567 77.5 186.2 2 89.5 2011 1115 115500 120000 69.36 19.16 120 3.835 98 2.052 142 10.545 77.5 186.2 2 89.6 2011 1115 120000 120500 69.36 19.16 127 3.580 98 1.763 142 10.542 77.5 186.2 2 89.8 2011 1115 120500 121000 69.36 19.16 120 3.558 98 1.713 142 10.515 77.5 186.2 2 89.9 2011 1115 121000 121500 69.36 19.16 127 3.196 98 1.594 142 10.501 77.5 186.2 2 90.1 2011 1115 121500 122000 69.36 19.16 120 2.820 98 1.497 134 10.485 77.5 186.2 2 90.3 2011 1115 122000 122500 69.36 19.16 120 3.041 98 1.372 134 10.439 77.5 186.2 2 90.5 2011 1115 122500 123000 69.36 19.16 127 2.976 101 1.310 142 10.446 77.5 186.2 2 90.7 2011 1115 123000 123500 69.36 19.16 127 2.703 101 1.079 134 10.390 77.5 186.2 2 90.9 2011 1115 123500 124000 69.36 19.16 127 2.667 101 1.062 142 10.407 77.5 186.2 2 91.1 2011 1115 124000 124500 69.36 19.16 120 2.728 101 1.011 142 10.417 77.5 186.2 2 91.3 2011 1115 124500 125000 69.36 19.16 127 2.654 104 0.976 142 10.393 77.5 186.2 2 91.6 2011 1115 125000 125500 69.36 19.16 127 2.480 98 0.944 142 10.353 77.5 186.2 2 91.8 2011 1115 125500 130000 69.36 19.16 126 2.203 98 0.919 142 10.297 77.5 186.2 2 92.0 2011 1115 130000 130500 69.36 19.16 127 2.274 104 0.743 142 10.277 77.5 186.2 2 92.3 2011 1115 130500 131000 69.36 19.16 127 2.162 115 0.669 142 10.298 77.5 186.2 2 92.5 2011 1115 131000 131500 69.36 19.16 120 1.971 95 0.907 142 10.289 77.5 186.2 2 92.8 2011 1115 131500 132000 69.36 19.16 127 1.672 98 0.918 142 10.236 77.5 186.2 2 93.1 2011 1115 132000 132500 69.36 19.16 120 1.609 98 1.330 142 10.236 77.5 186.2 2 93.4 2011 1115 132500 133000 69.36 19.16 120 1.580 98 1.307 142 10.258 77.5 186.2 2 93.6 2011 1115 133000 133500 69.36 19.16 127 1.605 101 1.241 142 10.336 77.5 186.2 2 93.9 2011 1115 133500 134000 69.36 19.16 76 1.790 76 1.532 142 10.352 77.5 186.2 2 94.2 2011 1115 134000 134500 69.36 19.16 120 2.726 110 2.638 120 10.663 77.5 186.2 2 94.5 2011 1115 134500 135000 69.36 19.16 120 4.023 110 5.066 110 10.964 77.5 186.2 2 94.9 2011 1115 135000 135500 69.36 19.16 120 4.169 110 4.697 115 10.990 77.5 186.2 2 95.2 2011 1115 135500 140000 69.36 19.16 120 3.598 115 3.149 120 10.921 77.5 186.2 2 95.5 2011 1115 140000 140200 69.36 19.16 120 3.061 115 2.521 127 10.846 77.5 186.2 2 95.8